Changing the Ended Date

3910
3
Jump to solution
03-05-2015 05:21 AM
ThomasFurcron
Occasional Contributor

Is there a way in workflow manager to change the ended date of a job?  We have a bunch that need to be entered for jobs already complete, but I would like the ended date to be corrected once they are entered.

0 Kudos
1 Solution

Accepted Solutions
XiaomengZheng
Esri Contributor

Hi, Thomas, the ended date attribute cannot be edited in the Workflow Manage client. However you could edit the END_DATE values for the desired jobs as needed in the JTX_JOBS table in the Workflow Manager database. This would solve your issue even though making changes directly to a WMX table is not something we normally recommend. If you need to edit the END_DATE values frequently, you could also create a script to run against the database.

View solution in original post

3 Replies
XiaomengZheng
Esri Contributor

Hi, Thomas, the ended date attribute cannot be edited in the Workflow Manage client. However you could edit the END_DATE values for the desired jobs as needed in the JTX_JOBS table in the Workflow Manager database. This would solve your issue even though making changes directly to a WMX table is not something we normally recommend. If you need to edit the END_DATE values frequently, you could also create a script to run against the database.

TopeBello
Occasional Contributor III

Hi Meggie,

I think you meant to respond via geonet. Do you have a login setup?

Thanks

Tope

0 Kudos
ThomasFurcron
Occasional Contributor

Thanks for the quick reply.  That is what I though, but I was hoping I was missing something.

Tom

0 Kudos