Hi Craig, Thanks for replying. This would be controlled by the dispatcher and be determined by the inspection type. Some inspections are weekly, monthly, fortnightly etc. A weekly inspection would most likely be dispatched at the start of the weeks it due, or maybe the end of the previous week, with a due date for the end of the week. Monthly inspection would be dispatched at the start of the due month and be due at the end. That seems to be the easiest way. Another thought could be to set the period in the assignment type. In our case a monthly pump inspection could have a due date of xx/xx/xxxx and then the assignment can automatically dispatch it via a predetermined rule 1 month earlier.
... View more