POST
|
Hi, I have a problem when I try to buffer. Error 999999 indicates "A buffer cannot currently cover both poles." I am wondering how to solve the problem. Thank you!
... View more
04-15-2016
11:28 AM
|
0
|
1
|
1942
|
POST
|
Hi Peter, I am wondering how you set the new cost value. I have a very similar project as you. Suppose the driving speed is 10 times higher than walking speed, how can I use this information to set the new cost value?
... View more
02-10-2016
07:15 PM
|
0
|
1
|
1562
|
POST
|
Hi all, I am a very new learner in arcgis. I want to learn how to create the least cost path. I follow two LCP tutorial from youtube. Least Cost Path Tutorial with ArcGIS 10 - YouTube and Least Cost Path - YouTube . I use my own data and follow their steps. But each time in the last step, when I use the Cost Path tool, I will have error 000622 and 000861. I am wondering the problem may be in my data. I have DEM data and two layers of starting point and destination point. Initially, the two points layers were created by csv file (with latitude and longitude), but it failed. And then I am wondering these layers are not feature layer (help of Cost Path tool says I need feature layer). And then, I try to use make feature layer tool to create two new layers. But I still had the same error when I use the Cost Path tool. Would someone please tell me how to solve the problem? Best, Meng
... View more
01-20-2016
12:13 PM
|
0
|
1
|
2203
|
Online Status |
Offline
|
Date Last Visited |
11-11-2020
02:24 AM
|