Well, if it is a big raster and highly braided it may take a long time.
An cell size is 1 meter I presume, which means your inputs and outputs are in the same projected coordinate system (?) If not, then a lot of work has to be done.
Work locally with locally stored data is the number 1 rule.
... sort of retired...