From my understanding, the admin and/or creator does not have any editing control on the assignment status (Unassigned, In Progress, Declined, etc). Having the ability as the administrator to edit/modify/create assignment status(s) would be a HUGE plus. Presently, we are not so much using the status description, but more of a specific colored symbol to indicate the assignment status. This makes it difficult for implementation and training. If the administrator could add project specific or task specific status(s), it would be a big benefit. We will need to have different status description(s) based on the project (Paid, Not-Paid, Investigation, Follow-up, etc). Now, based on the project creation, Assigned would be a Yellow symbol which would indicate an investigation requirement, as an example.
Thank You
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.